Skip to content

jointPm

Risk Estimation Using the Joint Probability Method

v2.3.2 · Apr 22, 2023 · GPL (>= 2)

Description

Estimate risk caused by two extreme and dependent forcing variables using bivariate extreme value models as described in Zheng, Westra, and Sisson (2013) <doi:10.1016/j.jhydrol.2013.09.054>; Zheng, Westra and Leonard (2014) <doi:10.1002/2013WR014616>; Zheng, Leonard and Westra (2015) <doi:10.2166/hydro.2015.052>.

Downloads

CRAN

553

Last 30 days

6365th

1.8K

Last 90 days

7.7K

Last year

Trend: -10.2% (30d vs prior 30d)

r2u CRAN

10

Last 30 days

25

Last 90 days

105

Last year

Trend: -28.6% (30d vs prior 30d)

autoCRAN

1

Last 7 days

5

Last 30 days

0

All-time

autoCRAN-only: this name is served only by autoCRAN, so the count is exact.

CRAN Check Status

13 OK
Show all 13 flavors
Flavor Status
r-devel-linux-x86_64-debian-clang OK
r-devel-linux-x86_64-debian-gcc OK
r-devel-linux-x86_64-fedora-clang OK
r-devel-linux-x86_64-fedora-gcc OK
r-devel-windows-x86_64 OK
r-oldrel-macos-arm64 OK
r-oldrel-macos-x86_64 OK
r-oldrel-windows-x86_64 OK
r-patched-linux-x86_64 OK
r-release-linux-x86_64 OK
r-release-macos-arm64 OK
r-release-macos-x86_64 OK
r-release-windows-x86_64 OK

Check History

OK 14 OK · 0 NOTE · 0 WARNING · 0 ERROR · 0 FAILURE Mar 10, 2026

Version History

3 tracked
new 2.3.2 Mar 10, 2026
updated 2.3.2 ← 2.3.1 diff Apr 22, 2023
new 2.3.1 Jan 9, 2014